SDS:Feb 25 2009 Meeting
From Tetherless World Wiki
Agenda February 25, 2009
- Plans for Thur/Frid visit
- VSTO Replica status
- svn up and running, portal base in svn
- will be checking with Josh later today
- Medha needs the machine for 3 weeks, might need to have VSTO shut down if memory constraints.
- Patrick will add VSTO to the Software Stack page
- still need to get the code changed for database access, restul services first and if can get tunneling done then go with it
- Patrick will get restful working
- check out VSTO code
- get VSTO running on my Mac
- go into VSTO and change to use restful services
- also need to change login, Stephan will check with Josh about taking off tab and Patrick will change OPeNDAP URL generation
- MDSA
- Wiki navigation template
- Also need to get the MDSA folks logins on the wiki using the LDAP wiki
- Will go on current tw and transfer over to the new tw when it is installed
- more tomorrow
- SPCDIS
- will go over tomorrow
- ESG (Agg., RNI)
- TW Wiki
- Peter met with Li, Evan
- Evan did functionality testing with SMW and provided demos
- The ontology needs a completer redesign
- there are 9 classes/templates
- The base class "class" admin use to generate new classes
- ontology is very close
- Next visit planning
- Patrick 6th
- Stephan on 15th - 20th
- Patrick will send an email to Jacky
- delegated credential support
- Good enough shape to bring this up with Rashana and James
- Peter will review the document and provide feedback